ABN Licence no.
Phone Email
Quote
Quote no.
Date
Valid until
Prepared for
Job address
Scope of work
| Description | Qty | Rate ex GST | Amount | |
|---|---|---|---|---|
| Bathroom renovation | ||||
| Waterproofing + tiling | ||||
| Plumbing: rough-in + fit-off | ||||
| Electrical: lighting, exhaust, heat/light | ||||
| Fixtures + PC items: vanity, toilet, tapware, screen | ||||
| Carpentry, plastering + painting | ||||
| Kitchen renovation | ||||
| Cabinetry: supply + install | ||||
| Benchtops: supply, fabricate + fit | ||||
| Splashback | ||||
| Appliance installation | ||||
| Plumbing: sink, dishwasher, gas | ||||
| Electrical: power, lighting, appliance circuits | ||||
| Patching + painting | ||||
| Demolition & prep | ||||
| Strip-out | ||||
| Skip bins | ||||
| Asbestos sample + testing allowance | ||||
| Floor protection + dust barriers | ||||
| Labour & site | ||||
| Builder / carpenter | ||||
| Labourer | ||||
| Site establishment + protection | ||||
| Extension / addition | ||||
| Extension build, slab to handover | ||||
| Roof tie-in + weatherproofing to the existing house | ||||
| Structural engineering + soil test | ||||
| Council / private certifier fees | ||||
| Granny flat / secondary dwelling | ||||
| Granny flat build, slab to handover | ||||
| Services: water, sewer + power connections | ||||
| Council / certifier / BASIX | ||||
| Site prep + earthworks | ||||
| Prefab / kit home install | ||||
| Kit assembly + install | ||||
| Slab / footings for the kit | ||||
| Crane hire | ||||
| Plumbing + electrical connections, licensed | ||||
| Deck / pergola (optional) | ||||
| Deck: hardwood boards, supplied + built (optional) | ||||
| Pergola / patio roof, Colorbond (optional) | ||||
| Project management & contingency | ||||
| Project management + site supervision | ||||
Subtotal ex GST
Total inc GST
Deposit to book%
Terms
- This quote is valid for 30 days and is subject to a signed building contract where the law requires one.
- Prime cost and provisional sum items are allowances. The final price is adjusted to the actual cost.
- Variations must be agreed in writing before the work is done.
- The deposit and progress payments follow the limits set by your state's home building laws.
- Permits, engineering and insurance are included only where listed.
Accepted by
Signature
Date