Free, printable, no sign-up

Free building and renovation quote template

A printable renovation quote set out by stage, with room for allowances, permits and site costs. It adds up as you type, GST included, ready to print or save as a PDF.

Click any blank to type. Put in a qty and a rate and the amount, GST and total work themselves out. Then print it or save it as a PDF. Nothing you type leaves your browser.

ABN Licence no.

Phone Email

Quote

Quote no.

Date

Valid until

Prepared for

Job address

Scope of work

Builder & renovations quote lines
DescriptionQtyRate ex GSTAmount
Bathroom renovation
Waterproofing + tiling
Plumbing: rough-in + fit-off
Electrical: lighting, exhaust, heat/light
Fixtures + PC items: vanity, toilet, tapware, screen
Carpentry, plastering + painting
Kitchen renovation
Cabinetry: supply + install
Benchtops: supply, fabricate + fit
Splashback
Appliance installation
Plumbing: sink, dishwasher, gas
Electrical: power, lighting, appliance circuits
Patching + painting
Demolition & prep
Strip-out
Skip bins
Asbestos sample + testing allowance
Floor protection + dust barriers
Labour & site
Builder / carpenter
Labourer
Site establishment + protection
Extension / addition
Extension build, slab to handover
Roof tie-in + weatherproofing to the existing house
Structural engineering + soil test
Council / private certifier fees
Granny flat / secondary dwelling
Granny flat build, slab to handover
Services: water, sewer + power connections
Council / certifier / BASIX
Site prep + earthworks
Prefab / kit home install
Kit assembly + install
Slab / footings for the kit
Crane hire
Plumbing + electrical connections, licensed
Deck / pergola (optional)
Deck: hardwood boards, supplied + built (optional)
Pergola / patio roof, Colorbond (optional)
Project management & contingency
Project management + site supervision

Subtotal ex GST

Total inc GST

Deposit to book%

Terms

  • This quote is valid for 30 days and is subject to a signed building contract where the law requires one.
  • Prime cost and provisional sum items are allowances. The final price is adjusted to the actual cost.
  • Variations must be agreed in writing before the work is done.
  • The deposit and progress payments follow the limits set by your state's home building laws.
  • Permits, engineering and insurance are included only where listed.

Accepted by

Signature

Date

Rough starting costs for these builder & renovations items

Ex GST. What these might cost you, not a price guide for your area. Your own rates, materials and travel come first, then add your profit before you put a rate on the quote. These are starting costs, not customer prices. Your profit goes on top: at 20% profit, a cost of $7,500 for “Waterproofing + tiling” is $9,000 to your customer.

  • Waterproofing + tiling$4,000 to $11,000
  • Plumbing: rough-in + fit-off$2,800 to $6,500
  • Electrical: lighting, exhaust, heat/light$1,200 to $3,000
  • Fixtures + PC items: vanity, toilet, tapware, screen$3,000 to $13,000
  • Carpentry, plastering + painting$2,000 to $6,000
  • Cabinetry: supply + install$8,000 to $28,000
  • Benchtops: supply, fabricate + fit$2,500 to $9,500
  • Splashback$800 to $2,800
  • Appliance installation$650
  • Plumbing: sink, dishwasher, gas$1,800
  • Electrical: power, lighting, appliance circuits$1,600
  • Patching + painting$1,200
  • Strip-out$1,500 / room
  • Skip bins$550 / each
  • Asbestos sample + testing allowance$600
  • Floor protection + dust barriers$350
  • Builder / carpenter$750 / day
  • Labourer$450 / day
  • Site establishment + protection$800
  • Extension build, slab to handover$2,600 to $4,200 / m²
  • Roof tie-in + weatherproofing to the existing house$4,500
  • Structural engineering + soil test$3,500 / allowance
  • Council / private certifier fees$3,000 / allowance
  • Granny flat build, slab to handover$2,400 to $3,600 / m²
  • Services: water, sewer + power connections$9,000 / allowance
  • Council / certifier / BASIX$4,500 / allowance
  • Site prep + earthworks$3,500 / allowance
  • Kit assembly + install$650 / m²
  • Slab / footings for the kit$180 / m²
  • Crane hire$1,800 / day
  • Plumbing + electrical connections, licensed$6,000 / allowance
  • Deck: hardwood boards, supplied + built$450 / m²
  • Pergola / patio roof, Colorbond$400 / m²
  • Project management + site supervision$1,500 / week

Why a link quote beats a PDF template

Clients forward a PDF to everyone and pick at every line. The link lets you show section totals, and records who accepted and when.

  • They say yes on their phone. Accept with their name, a tick or a signature, with a record of who and when.
  • Extras and choices add themselves up. They tick an optional extra or pick one option and the total, GST and deposit follow.
  • The deposit comes with the yes. By card when they accept, or your bank and PayID details show straight after.
  • You know when it's opened. And Karven has a follow-up written for the quiet ones. Nothing goes until you tap Send.
  • They still get a PDF. Attached to the email, matching the link line for line.

Builder & renovations at 14 Banksia Avenue

Prices ex GST

Bathroom renovation

Bathroom renovation. Room size: 1.8m x 1.5m. New fixtures and finishes as selected, installed and sealed. Waterproofing to AS 3740 with compliance certificate. All plumbing and electrical by licensed trades, certificates supplied. Site protected during works and left clean on completion. Fixture and tile selections to be confirmed with you before order.

Waterproofing + tiling, refresh

$4,800.00

Plumbing: rough-in + fit-off, refresh (certified)

$3,360.00

Electrical: lighting, exhaust, heat/light, refresh (certified)

$1,440.00

Fixtures + PC items: vanity, toilet, tapware, screen, refresh

$3,600.00

Carpentry, plastering + painting, refresh

$2,400.00

Includes all work and materials listed above.

Subtotal (ex GST)
$15,600.00
GST (10%)
$1,560.00
Total inc GST
$17,160.00

A $1,716.00 deposit (10% of the total) is due when you accept.

Ridgeline Building0491 570 156hello@example.comQuote no.RB-2026-014Date20 Oct 2026Prepared forSam Nguyen14 Banksia Avenue, Penrith NSW 2750sam.nguyen@example.comValid until19 Nov 2026Builder & renovations at 14 Banksia AvenuePrices ex GSTBathroom renovationBathroom renovation.Room size: 1.8m x 1.5m.New fixtures and finishes as selected, installed and sealed.Waterproofing to AS 3740 with compliance certificate.All plumbing and electrical by licensed trades, certificates supplied.Site protected during works and left clean on completion.Fixture and tile selections to be confirmed with you before order.Waterproofing + tiling, refresh$4,800.00Plumbing: rough-in + fit-off, refresh (certified)$3,360.00Electrical: lighting, exhaust, heat/light, refresh (certified)$1,440.00Fixtures + PC items: vanity, toilet, tapware, screen, refresh$3,600.00Carpentry, plastering + painting, refresh$2,400.00Subtotal (ex GST)$15,600.00GST (10%)$1,560.00Total inc GST$17,160.00A $1,716.00 deposit (10% of the total) is due when you accept.Ridgeline Building

The same sample builder & renovations quote as a link on the customer's phone and as the PDF that goes with it. One document, so they always say the same thing.

Skip the maths and the printing

In Karven these builder & renovations items come up as you type with your cost, your profit % is added on top and GST is added for you. Your customer gets a link: they tick any extras, ask a question, accept and pay the deposit by card. You see when they've opened it.

Quote template questions

Common questions

  • Is this builder & renovations quote template really free?

    Yes. No email, no sign-up. Type on the page, then print it or save it as a PDF from your browser's print screen.

  • Should my quote show prices including GST?

    If you're registered for GST, show the total including GST. Australian consumer law expects consumers to see a single total price, and the ATO's tax invoice rules apply when the job is invoiced. If you're not registered, don't add GST at all.

  • What terms suit a builder & renovations quote?

    This template starts with these: This quote is valid for 30 days and is subject to a signed building contract where the law requires one. Prime cost and provisional sum items are allowances. The final price is adjusted to the actual cost. Variations must be agreed in writing before the work is done. Change them to suit how you work.

  • How long should a quote be valid for?

    Most tradies use 14 to 30 days, because material prices move. Put the date on the quote so there's no argument later.

  • What's the difference between this template and Karven?

    This template is a printable page you fill in by hand. Karven builds the quote for you from your own items and prices, adds GST, sends it as a link the customer can accept and pay a deposit on, and tells you when it's opened. 21 days free, then $29/mo inc GST.