ABN Licence no.
Phone Email
Quote
Quote no.
Date
Valid until
Prepared for
Job address
Scope of work
| Description | Qty | Rate ex GST | Amount | |
|---|---|---|---|---|
| Power points & data | ||||
| Double power point | ||||
| Single power point | ||||
| USB-A/C double power point | ||||
| Outdoor weatherproof power point | ||||
| Data point, Cat6 | ||||
| TV / antenna point | ||||
| New circuit from the switchboard | ||||
| Oven / cooktop connect, hardwired | ||||
| Lighting & fans | ||||
| LED downlight, new: tri-colour 10W | ||||
| LED downlight, new: premium dimmable, flush fit | ||||
| Swap old halogen downlight to LED | ||||
| Light point: switch + fitting | ||||
| Ceiling fan with light, supplied + installed | ||||
| Ceiling fan install only, your fan | ||||
| Exhaust fan, ducted to outside | ||||
| Outdoor / garden light point | ||||
| Smoke alarms & safety switches | ||||
| Smoke alarm: 240V photoelectric, interconnected | ||||
| Smoke alarm: 10-year lithium, wireless interconnected | ||||
| Safety switch (RCD) added to the board | ||||
| Switchboard & EV charger | ||||
| Switchboard upgrade: single phase, RCBO protection | ||||
| Switchboard upgrade: three phase, RCBO protection | ||||
| Extra RCBO added to the board | ||||
| Sub-board | ||||
| EV charger 7kW single phase, supplied + installed | ||||
| EV charger 22kW three phase, supplied + installed | ||||
| EV charger install only, your charger | ||||
| Split system air conditioning | ||||
| Split system 2.5kW, supplied + installed back-to-back | ||||
| Split system 3.5kW, supplied + installed back-to-back | ||||
| Split system 5kW, supplied + installed back-to-back | ||||
| Split system 7kW, supplied + installed back-to-back | ||||
| Split system 8kW, supplied + installed back-to-back | ||||
| Extra pipe run beyond back-to-back | ||||
| Install only, your unit, back-to-back | ||||
| Wall bracket / roof stand | ||||
| Call-out, fault-finding & labour | ||||
| Call-out + first half hour | ||||
| Fault-finding / labour | ||||
| Compliance certificate lodgement | ||||
Subtotal ex GST
Total inc GST
Deposit to book%
Terms
- This quote is valid for 30 days from the date above.
- All work is carried out by a licensed electrician, tested and certified on completion.
- Any extra work found on site, such as faulty existing wiring, will be quoted in writing before we do it.
- Patching and painting after cable runs is not included unless listed.
- A deposit is due on acceptance to book the job. The balance is due on completion.
Accepted by
Signature
Date